On To Windows

Dec. 2: It has been a while since we had big changes in the build. The crew has been focused on finalizing framing for the floor and window installations. The window have been in the garage for a week or so; installation has commenced, and it is very exciting to see the changes in the build. We look forward to more changes in the coming weeks!

Prepping for window installation

Prepping for window installation

Window into the living room with the bronze trim that will be on the outside of all windows.

Window into the living room with the bronze trim that will be on the outside of all windows.

Windows on the east side of the house, over the kitchen and across from the pantry

Windows on the east side of the house, over the kitchen and across from the pantry

Window in the great room with the fir trim....

Window in the great room with the fir trim....